Ask us about next day delivery by calling 01325 488 588
Order Helpline 01325 488 588 | Open today 8:00am-4:45pm
Order Helpline 01325 488 588

Nuie 700mm White Shower Bath End Panel

Code:
WBS301
Brand:

Looking for a minimalist, crisp look for your bathroom suite? Check out this elegant high gloss shower bath end panel from Nuie. Manufactured from lightweight sanitary grade acrylic for extra durability, it's suitable for use with square shower baths. These on-trend panels com... Read More

£72.44 Incl. VAT
Earn points

SUPER Rewards Earn points and build more across our SUPERSTORES!

Find out more
Oops! Please select from the options
Est. Delivery: 3-5 Working Days
Shipping costs displayed in basket.
We can let you know when this product is back in stock.

This product is proving to be very popular and has unfortunately sold out.

Enter your email below and we'll notify you as soon as this product is back in stock:

For delivery Tuesday, Jan 20th - order in:
days hrs mins secs
View Transport Policy

Next day delivery is subject to stock availability. If products on a 24 hours service are ordered alongside products NOT on a 24 hours service, this may delay your whole order.

All delivery charges are included in the final shopping basket and are dependent on the products Scottish Highlands & the Islands where additional shipping charges will apply.

Please note that not all products will incur an additional delivery charge to the Scottish Highlands & the Islands – this is based on the costs from the manufacturer, distributor or courier providing shipping on our behalf. If your delivery address is in the Scottish Highlands and Islands, a member of our helpline team will contact you prior to processing your order should an additional delivery charge apply.

While we make every effort to ensure orders are delivered by the date required, we cannot guarantee availability from the manufacturer or the manufacturer's delivery schedules.

Any variation to web delivery date given will be advised to you by email or telephone. If we are unable to make delivery because access is not possible, we reserve the right to make a failed delivery charge.

Create a wishlist

"Great product"

Emma Shakespeare

Description

Looking for a minimalist, crisp look for your bathroom suite? Check out this elegant high gloss shower bath end panel from Nuie. Manufactured from lightweight sanitary grade acrylic for extra durability, it's suitable for use with square shower baths. These on-trend panels come with a 5-year guarantee against faulty workmanship and materials, so you know they're designed to the highest standards and built to last. To complete that neat contemporary bathroom look, consider the matching bath front panel from Nuie.

Features & Benefits: Nuie 700mm White Shower Bath End Panel

  • Highly durable shower bath end panel
  • Manufactured from high gloss white acrylic panelSuitable for use with square shower baths
  • Matching bath front panel also available
  • 700mm in size

Please note:

  • During installation, you must take extra care to avoid damaging the fittings. The manufacturer provides a 5-year guarantee against faulty workmanship or materials (excluding serviceable parts), providing they have been installed, cared for, and used according to the instructions.

Dimensions

Length
700mm
Depth
26mm
Size
700mm x 500mm
Width
500mm

Details

Material
Acrylic
Finish
Gloss
Colour
White
Shape
Square
Use Location
End

Downloads

There are no product downloads to show.

Questions & Answers

There are currently no questions for this product.

Have a question about this product?

loading...

Product Enquiry Form

Nuie 700mm White Shower Bath End Panel

*Required Field